On the results of activity for 2015 and plans for 2016 was told in the final meeting of the Committee on Water Resources of the Ministry of Agriculture.
This year, the Committee on Water Resources of the Ministry of Agriculture were developed and approved in the context of limits on water basins and regions in 2015. On the basis of limits established regimes of large reservoirs and water accumulated the necessary resources to meet the needs of industry, agriculture and drinking water, have been satisfied in full.
Within the framework of regulation of use and protection of water resources in the current year would be a number of events. They include drawing up the State Water Cadastre and development of quality standards for surface water bodies, the schema update the integrated use and protection of water resources in the basins of four rivers and the introduction of Unified information and analytical system for water resources management.

In the framework of inter-state agreements on water sharing in transboundary rivers in 2015 by the Committee on Water Resources of the Ministry of Agriculture provided the work of experts and responsible authorities in the agreement between Kazakhstan and China. Work is underway to analyze the impact of the hydrological regime and the arrival of toxicants on transboundary rivers Tobol, Ishim, Shu and Talas and the formation of the state of biological resources in the waters Torgai Tobol, Ishim and Shu-Talas basins.
Public service since the beginning of the year was considered more than three hundred calculations of specific norms of water and sanitation. In order to implement the principles of rational use of water resources is developing the integrated water use and sanitation standards.
Basin Water Inspectorate (BVI) Committee on Water Resources for 9 months of 2015 was carried out 219 checks on observance of the requirements of water users of water and nature protection legislation, that 49 (28.8%) more than the same period of inspections in 2014. Revealed 254 violations, issued 188 orders to eliminate the revealed violations, imposed 175 administrative fines.

Hydrogeological-reclamation services WRC MA RK carrying out activities on monitoring and evaluation of irrigated land in the area of about 1.2 million. Ha.
In cooperation with the international financial institutions CWR Ministry of Agriculture is implementing the project “Improvement of irrigation and drainage systems” (PUID-2) to improve water availability and irrigated land with total area of 113.0 thousand. Ha.
Special attention deserves the project “Development of objects of protection of groundwater and industrial wastewater in Ust-Kamenogorsk.” Today the fully completed work on three high-priority sources of pollution and expected to be completed by the fourth aspect of pollution.
Ready to implement the project “Syr Darya Control and Northern Aral Sea. Phase II »(RRSSAM-2).
In order to implement the State Program of Water Resources Management Committee of Water Resources Ministry of Agriculture is working to attract international financial institutions. To date agreed RSE “Kazvodhoz” with the Islamic Development Bank on the allocation of investment funds in the amount of 411.0 mln. Dollars that will be spent on the restoration of irrigated lands of Almaty region, restoration of drainage wells in the South Kazakhstan region and the completion of construction started objects of drinking water supply in Almaty, Kyzylorda and North Kazakhstan oblasts.

Within the framework of the sectoral budget program 235 “Construction and reconstruction of water supply systems, hydraulic structures” CWR Ministry of Agriculture implemented 32 projects worth a total of 49 745 bln. Tenge. Of these, in 2015 allocated 11, 084 billion. Tenge and disbursed as of 01.12.2015 was 9.046 billion. Tenge, since the beginning of construction, taking into account the budget in previous years, according to the draft budget disbursed in the amount of 25.5 billion . m. As of 12.12.2015, the regulations adopted by state commissions into operation 6 objects 3 objects work is still under way, is expected to hold the working committee before the end of December 2015 for completion in the first half of 2016 another 9 planned water supply facilities.

Construction and reconstruction of water supply systems in the framework of the budget program “Construction and reconstruction of water supply systems, hydraulic structures” in 2015 from the state budget allocated 7 566.5 million. Tenge and 28 projects. Of these, as of 10.12.2015g. 9 surrendered the state commission, mastered 6 413.7 million. Tenge. Expected development of the rest of the year will amount to 100%.

Within the framework of the sectoral budget program “Overhaul and restoration particularly damaged sections of inter-farm canals and drainage structures” is implemented 4 projects worth 1.432 billion works. Tenge, of which in 2015 allocated 0.817 billion. Tenge. These facilities are scheduled for completion before the end of December 2015.
According to the decision of the Republican Budget Commission continued implementation of the project “Reconstruction of hydraulic structures on Arnasay Shardarinsky dam reservoir area Shardary SKO (2,3,4 line)” allocated 2.641 billion. Tenge. Construction of the dam Arnasay improves socio-economic situation in the region an opportunity to increase hydroelectric power generation Shardarinskaya due to run at full power operation Shardarinsky reservoir, which in turn guarantees additional 1.2 bln. Cubic meters of water annually. In addition, the project envisages the construction of roads, which reduces the path of communication between the two districts of South Kazakhstan region.